•Concepts of set-up/ changeover time and benefits
•Set-up change and inventory turns
•Systematic approach to set up time reduction,
•Implementing set-up changeover techniques
•Case studies of set up reduction on machining centres
•Relevance to tool-rooms and small batch production
In this time of uncertainty only agile companies will survive. Agility in terms of shortest delivery time with minimum inventory is the name of the game. The concept of Minimum Order Quantity or MOQ has fallen by the wayside. Customers decide when they want and in what quantities and are unwilling to pay more for this service. The focus on quick changeover or set-up change is like never before. The manufacturers must have the ability to produce smaller batch quantities and deliver them more quickly. They must be able to utilize equipment for as many different parts as possible.
Keeping this in view, Indian Machine Tool Manufacturers' Association (IMTMA) is organizing a program on ‘How to reduce set up time in CNC machining centres’.
• Relationship between setup time reduction & profitability
• Step by step approach to set up time reduction
• Set up time reduction at the heart of JIT
• Zero point clamping systems
• Magnetic fixtures
• Vacuum fixtures
BENGALURU
IMTMA Technology Centre
(BIEC)10th Mile,Tumkur Road, Madavara
Bengaluru - 562123
Email : info@imtmatraining.in
Phone : +91 80 66246600
GURUGRAM
IMTMA Technology Centre
Plot no. 249 F, Phase IV, Udyog vihar Sector - 18, Gurugram - 122015
Email : info@imtmatraining.in
Phone : +91 124 4014101
PUNE
IMTMA Technology Centre
12/5, D-1 Block MIDC Chinchwad
Pune - 411019
Email : info@imtmatraining.in
Phone : +91 7066030531
Copyright © 2024 IMTMA. All Rights Reserved.